Silver Bow Creek culvert

Culvert built by the Butte Reduction Works to allow Silver Bow Creek to flow through its tailings deposit without carrying them away. As tailings were discharged from the concentrator, they slowly flowed toward the outlet at the left, allowing many of the solids to settle before the water poured through the outlet. | Source: National Archives and Records Administration, Denver Branch.
Download Original File